Address
Our Head Office is in the Center of Tripoli, Libya
Decommissioning of Tetra Ethyl Lead plant. The operations were conducted with Sepor and Italian company specialized on TEL-
Special Equipment was mobilized to Libya on Purpose.
TEL is extremely hazardous and Operations inside the tanks were conducted with full breathing breathing apparatus under severe climatic conditions.
Preparation, re-packing for Transboundary Movement of Hazardous Waste to final incineration
TEL sludge, TEL polluted water, TEL polluted plastic Total 33,5 tons
Exported and disposed
(Incinerated in
Germany) Currenta Plant. Operations were run in Ramadan Period and concluded the first day of Eid, making it extremely difficult coordination with the different parties involved. The operation was a success.